All Transport
ITF 交通运输展望2023
Transport Outlook, Policy Insights,
15 May 2024
- 为未来交通运输及燃料补充基础设施制定全面的发展战略
- 加速向清洁车辆转变
- 在最有效的地区实施交通模式转变和交通需求管理政策
- 评估政策时要考虑城区的额外收益
- 改革车辆税,捕获新车辆的外部成本
Perspectives des transports FIT 2023
Transport Outlook, Policy Insights,
29 April 2024
- Élaborer des stratégies globales au service de la mobilité et des infrastructures de demain
- Accélérer la transition vers des flottes de véhicules propres
- Mettre en œuvre des politiques de report modal et de gestion de la demande là où elles sont le plus efficaces
- Au stade de l’évaluation, considérer les avantages additionnels qu’une politique peut apporter aux zones urbaines
- Réformer la fiscalité automobile de façon à capter les coûts externes des nouveaux parcs de véhicules
Transport System Resilience
Roundtable Report, Policy Insights,
10 April 2024
- Transport networks are vulnerable. Transport systems face multiple disruptions, from geopolitical tensions and climate change impacts to pandemics. Understanding these disruptions is crucial for strengthening their resilience.
- Disruptions have spillover effects. Transport networks are interconnected, and transport disruptions in one part of the world can easily spread to other regions. Managing such spillover effects requires inter-regional co-operation.
- Be systematic about resilience. The concept of transport resilience must be built into national-level policies, long-term plans, appraisal procedures, competition policies and transport indicators.
Better Regulation of Public-Private Partnerships for Transport Infrastructure
Roundtable Report, Policy Insights,
24 September 2013
- A mix of financing models spreads risks.
- A dedicated budget for PPPs, set in relation to the rate at which future liabilities will be accumulated, can provide such a limit.
- Explicit consideration of alternative financing arrangements should be employed in determining whether to proceed with PPP projects.
- It is recommended that governments require PPP projects to pass tests of affordability and to clear the hurdle rates of return generally applied to publicly financed transport projects.
- The expected cost of PPP projects should take account of cost inflation resulting from the propensity for projects to be renegotiated.
- At the individual project level, risks should be assigned to the party best able to manage them, along with rights to make related decisions.
- Assigning demand risk is not straightforward and risk sharing arrangements are therefore common.
- Continuity of resources and expertise is essential for addressing strategic behaviour and optimism bias more generally.
- Regulatory agencies are well placed to ensure transparency and accountability by publishing reports on the criteria employed to make decisions and publishing contracts.