Rail
Appendix I: Decree by the Ministry of Transport of the Russian Federation on Approval of Initial and Periodic Training Programmes for Professional Competence
Official Document,
13 September 2016
Appendix II: Act on the Organisation of Working Time in Transport and on Amendments of the Act No 125/2006 Coll. on Labour Inspection and on Amendments of the Act No 82/2005 Coll.
Official Document,
1 September 2016
Appendix III: Decree of the Ministry of Transport, Construction and Regional Development of the Slovak Republic Implementing the Act No 56/2012 Coll. on Road Transport, of 21 March 2012
Official Document,
31 August 2016
Appendix I: Act on Compulsory Initial Qualification and Periodic Training of Certain Drivers (21 April 2006)
Official Document,
31 August 2016
Capacity to Grow: Transport Infrastructure Needs for Future Trade Growth
Corporate Partnership Board Report, Policy Insights,
8 May 2016
- Develop planning tools to adapt to uncertainties: Good port planning means planning for uncertainties.
- Increase port capacity by optimising existing terminals.
- Take a holistic planning approach to improving port capacity needs as part of the entire supply chain.
- Use funding as a balancing tool in port capacity development.
Estableciendo la Agencia Reguladora del Transporte Ferroviario de México
Case-Specific Policy Analysis,
9 March 2016
Establishing Mexico’s Regulatory Agency for Rail Transport
Case-Specific Policy Analysis, Policy Insights,
29 February 2016
- Any reform of the rail concessioning system must preserve the current high level of performance.
- Accept price discrimination to ensure efficiency, with the regulatory agency to adjudicate what prices are reasonable.
- Focus regulation on cases where effective competition does not already exist.
- Collect adequate financial and operating data on the rail companies as the basis for effective regulatory decisions.
- Consider cutting the cost of regulation by including an arbitration mechanism in any further regulatory reform.
- Consider inter-switching rules in any further regulatory reform.
- Interchange traffic rights should not be expected to be used for shippers to specify routes.
- Resource the new regulator with sufficient expertise to convince the courts that its decisions are sound.
Logistics Strategy and Performance Measurement: Mexico’s National Observatory for Transport and Logistics
Case-Specific Policy Analysis,
30 April 2015
The Impact of Mega-Ships
Case-Specific Policy Analysis, Policy Insights,
30 April 2015
- Cost savings from bigger container ships are decreasing.
- The transport costs due to larger ships could be substantial.
- Supply chain risks related to mega-container ships are rising.
- Public policies need to better take account of this and act accordingly.
- Further increase of maximum container ship size would raise ransport costs.
Drivers of Logistics Performance: A Case Study of Turkey
Corporate Partnership Board Report, Policy Insights,
30 April 2015
- Policy actions creating the highest improvement in the logistics performance vary for different income levels.
- Reducing the variability of customs clearance time is an important element for improving the efficiency of border crossing procedures.
- Capacity management plays a vital role in infrastructure efficiency.
- Intermodal transport systems, including good access to roads, terminals and seaport channels, are fundamental for a high-quality transport infrastructure.
- A successful logistics industry is essential in providing high quality logistics services.
- Resilience-improving policies and investments are necessary.
Model of ECMT Certificate of Compliance of a Trailer of TPLW not Exceeding 3.5 Tonnes with the Technical Safety Requirements
Guidelines/User Guide,
1 January 2015
Model of Certificate of Compliance with Technical Provisions Concerning Exhaust and Noise Emissions and Safety Requirements for “EURO IV/4 Safe", "EURO V/5 Safe", "EEV Safe" or "EURO VI/6 Safe" Motor Vehicle (Lorry) of TPLW above 3.5 and not Exceeding 6 T
Guidelines/User Guide,
1 January 2015
КОНТРОЛЬНЫЕ ПРОЦЕДУРЫ для грузовиков с МРГВ свыше 3,5 тонн и не более 6 тонн начиная с 1 января 2015 года
Guidelines/User Guide,
1 January 2015
Control Procedures for Vehicles with TPLW above 3.5 and not Exceeding 6 Tonnes as from 1 January 2015
Guidelines/User Guide,
1 January 2015